First we present the relation between the stages and away of working so they can evaluate and calculate the methodology and times in the implementation of projects, studies and construction

 

BASIC STAGES.
1. - Purchase land
2. - Project
3. - Procedures
4. - Construction

Land Analysis

Together with our client we visit different land sites, so we can recommend the best as for as, location, orientation, topography, etc.

Land Limitations

We request from the housing estate the regulations and obligations needed to carry out the project.
The following procedure is to go to the Authority for the judgment of the use of the land to know the limitations and ranges.

Draft

Based on preliminary meeting, needs and space are defined according to the information provided by the client, where they express wishes and requirements. With all the information at hand we draw up the draft at a scale of 1:100 with this to get the main architectural idea. With the draft made, client and company make a profound analysis with the purpose of reaching a joint conclusion to correct, modify and accept the proposal.
In this specific concept, the times employed during this stage may be altered due the decision, needs and requires of the client.

Executive project

Once the draft has been defined on floor plans, facades and sections it becomes a final project. The plans are made in Auto cad system on a scale of 1:50 with all the constructive details, which later will be used to calculate, study and execute the project.

Calc and Studies

Land Survey ¯ The purpose is to know the characteristic of the land on which the construction will be built to determine the sort of structure that should be considered in the building, and by this way avoid any possible move of the land that affects the structure of the house.
Structural Studies ¯ Based on the Land Survey the loads of the structure will be determined considering the architectural project and structural elements.
Electric, Hydraulic and Intelligent Systems Studies ¯ Based on the architectural project another installation project will be carried out, with the object of establishing the needs of the whole construction.

Budget

Once all the information and final project are done, including finishing, we proceed to make a budget, which include all the material needs and costs up to date specifying the concepts that were managed. In this stage it is very important the collaboration of the client, in order to define the finishing touches and details of the project.

2.1 Permission from the residents association.
The association goes over the draft. Once it is approved, the blueprints are handed in for the authorization and stamping.

2.2 Alignment and official number
This procedure can be done from the beginning, as it does not require the blueprints.

2.3 Land Registry and License permit pay the state
It has to be paid before start the construction.

2.4 Supervision.
Pay for the supervision, authorization of the final blueprints and logbooks from an authority registered at the government office.

 



At the beginning of the construction a joint account is opened with at the client name, to handle the founds and costs of the project. Each work is independent in the bookkeeping and management of resources.
Based on the project and time of work, a calendar is implemented with the cost estimated according to the building period. A course is presented which estimates the sum of money required to carry out the construction.
A record of costs is presented weekly according to the book of movements. Supporting documents are included.
The visits to the work site with the client, establish the requirements of each stage. These visits are carried out on both parts, according to appointments.

Fees

The percentage will be set for the project, administration and management of the construction based on the payments during the construction, which will be indicated every week in the record.